Borehole Wall Release Agent(Drilling Work

Kabe Toru

Peeling off the mud wall after excavation is complete.

Distinctive feature

1. Release the borehole wall of the water well

Please use it for the finishing touch.

2. Works quickly

After being sent into the borehole, the removal of the borehole wall begins within a short time.

3. Requires a small amount and makes the work easier

Only 0.2 % to 0.5 % of the borehole volume is needed.

Application site

Water Well
Hot Spring Drilling
Water Level Observation Well

Packaging Type

Net Weight 2 kg
Package Style polybag

How to use

While stirring 100 L of water in a mixer, gradually add 0.2 to 0.5 kg of Kabe Toru. Stir for about 10 to 15 minutes before sending it into the borehole.