Mud Loss Preventer(Drilling Work

Tomekichi

Prevent mud loss.

Distinctive feature

It fills the gaps in the geological formation and helps prevent mud loss.

Application site

Geotechnical Drilling
Water Well
Hot Spring Drilling

Packaging Type

Net Weight 10 kg
Package Style 1 polybag × 1 bag, carton

How to use

    1. While stirring 100 L of water in the mixer, add 1-2 kg of Tomekichi and reduce the pump pressure for circulation.
    2. Check for the presence of Tomekichi in the return slurry, and if it decreases due to absorption by the geological formation, add more Tomekichi.
    3. When using Tomekichi in combination with bentonite, please use one of the following mixtures for 100 L of water:
      ①Tomekichi 1 kg + Bentonite 6 kg
      ②Tomekichi 2 kg + Bentonite 3 kg
    4. The swelling speed may vary depending on water temperature and quality, so please conduct a table test before preparing the slurry.
    5. If the screen becomes clogged, remove the mesh and directly transfer the return slurry into the tank.
    6. If the slurry preparation takes too long and Tomekichi becomes hard in the tank, add water to dilute and use it.